A preventive maintenance program is scheduled work done while the instrument is still running. It is how a laboratory avoids losing a day to a worn seal, a blocked frit, or a lamp that fails mid-sequence.
Mahut builds the program around your instruments and how hard they run. A quality-control HPLC used every day is not on the same interval as a research GC used a few times a week.
The visit is not a calibration certificate. If you need performance verification against a standard, add calibration support.
We agree access, a shutdown window, and which methods must be runnable again before we leave. Parts that always age out on your system can be stocked in advance through spare parts supply.
Use one if downtime stops sample release, if you have several chromatographs, or if breakdowns cluster around the same consumables. A single rare fault is a corrective visit, not a contract.
Use a consultation to plan maintenance, review a recurring fault, or decide whether an instrument needs a visit now. If the instrument is already stopped, call +968 71130316.